Rapport de PRs prêtes à fusionner

Affiche un rapport des PRs ClickHouse ouvertes dont tous les checks CI sont verts sauf éventuellement 'CH Inc sync', donc prêtes à fusionner. Groupées par auteur, assignés et auteurs suivis.

Spar Skills Guide Bot
DeveloppementDébutant
0029/08/2026
Claude Code
#github#pull-requests#ci#merge-ready#clickhouse

Recommandé pour


name: good-prs description: Show a report of open ClickHouse PRs whose only non-green CI check is "CH Inc sync" (or that are fully green) — i.e. effectively ready to merge. Groups by your authored PRs, PRs assigned to you (authored by others), and PRs by tracked authors (default groeneai). Shows the CH Inc sync state and whether each PR was ever approved; excludes already-merged PRs. Use when asked for "good PRs", merge-ready PRs, or PRs blocked only on the sync job. argument-hint: "[tracked-author ...] # default: groeneai" disable-model-invocation: false allowed-tools: Bash(bash:), Bash(gh:), Bash(jq:), Bash(xargs:), Bash(awk:), Bash(grep:), Bash(cut:), Bash(sed:), Read

Good PRs Skill

Produce a report of open pull requests in ClickHouse/ClickHouse that are effectively ready to merge: every CI check is green/skipped except possibly CH Inc sync, which is the private-repo sync job and is frequently the last thing standing between a PR and merge. Fully-green PRs are included too.

What counts as a "good PR"

For each PR, look at all checks and ignore the aggregate gates (PR, Mergeable Check, A Sync (only for tests)). A PR qualifies when every remaining check other than CH Inc sync is SUCCESS, SKIPPED, or NEUTRAL (nothing else is failing or still running). The CH Inc sync state is then reported as one of:

  • GREENCH Inc sync also passed → fully green / merge-ready.
  • FAILED — only CH Inc sync failed.
  • INPROG — only CH Inc sync is still running (PENDING/IN_PROGRESS).
  • NOSYNC — there is no CH Inc sync check at all and everything else is green (typically release-branch backports).

Already-merged or closed PRs are excluded. Each row also shows whether the PR was approved by anyone at least once (any historical APPROVED review event; it does not require the approval to still be current after later pushes).

Sections

  1. Your own PRs — authored by the authenticated gh user.
  2. Assigned to you, authored by others — assigned to you, excluding your own PRs and the tracked authors (those get their own section).
  3. PRs by each tracked author — every qualifying PR by the author, regardless of assignee. Default tracked author: groeneai. Pass author logins as arguments to change this (e.g. good-prs groeneai azat).

How to run

Run the bundled script and present its Markdown output directly to the user (it already emits finished tables):

bash .claude/skills/good-prs/report.sh $ARGUMENTS

The script fetches PR lists with gh pr list, classifies each PR's checks with gh pr checks, and looks up state + approvals with gh pr view, all parallelized with xargs -P 12. For groeneai-sized author sets (~200 open PRs) it takes roughly a minute. Every gh call is pinned to --repo ClickHouse/ClickHouse, so the report is correct regardless of the directory the skill is run from.

Testing

test.sh runs report.sh against a stubbed gh (no network) and checks the bucket→label classification, the "only CH Inc sync is non-green" criterion, empty input, --repo pinning, the fail-loud-on-real-error behaviour, and the retry policy (a transient failure is retried until it succeeds, a permanent one is not retried):

bash .claude/skills/good-prs/test.sh

Presentation

  • The script's stdout is a complete report — show it as-is.
  • Statuses drift constantly as CI runs; if the user asks to "check again", just re-run the script. Mention it is a point-in-time snapshot.
  • If the user wants only the failed/in-progress subset (not the fully-green ones), filter the rows to FAILED/INPROG after running, or note which rows are GREEN.

Notes and caveats

  • gh pr list --author <login> is backed by GitHub's search index, which can occasionally omit an individual PR (a stale-index gap). If a specific PR is known to be missing, fetch it explicitly with gh pr view <n> and add it.
  • The aggregate gates excluded from the "everything else is green" test are PR, Mergeable Check, and A Sync (only for tests). If ClickHouse CI renames or adds an aggregate gate, update the select(...) filter in report.sh.
  • Checks are classified by gh pr checks' own bucket field (pass / fail / pending / skipping / cancel), not by raw state strings, so unusual states such as QUEUED, TIMED_OUT, CANCELLED, or STARTUP_FAILURE are handled without a PR being silently dropped.
  • A full report makes roughly two GraphQL calls per PR — several hundred per run — so hitting at least one transient GitHub failure is close to certain. Those (HTTP 408, 429, any 5xx, gateway timeouts, connection resets, secondary rate limits) are retried with exponential backoff, and a primary rate-limit rejection waits for the hourly window to reset. GH_RETRIES (default 5) and GH_RETRY_DELAY (default 2 seconds) tune this.
  • The script still fails loudly: an error that will never fix itself (auth, unknown PR, bad flag) aborts on the first attempt, and a transient error that outlives every retry aborts too — in both cases with the original gh diagnostic, rather than silently omitting that PR from the report.
  • A run costs a large share of the hourly GraphQL quota (5000 points), so a few back-to-back runs can exhaust it. Check with gh api rate_limit --jq .resources.graphql.
  • The script needs gh authenticated and jq available.
Skills similaires